The existing width of the stream is contracted at the bridge site by _________
(a) U/s wing walls
(b) D/s wing walls
(c) Canal wings
(d) Drain wings
This question was posed to me in an online interview.
My question is taken from Culverts Construction topic in chapter Culverts and Small Road Bridges Construction of Irrigation Engineering