The crossing arrangement preferably made at the junction of a huge canal and a river stream carrying a short-lived high flood discharge at almost equal bed levels is a __________
(a) super passage
(b) aqueduct
(c) level crossing
(d) canal syphon
This question was posed to me by my college professor while I was bunking the class.
I'd like to ask this question from Types of Cross Drainage Work topic in division Cross Drainage Work of Irrigation Engineering