Which CD work is generally adopted when the drainage discharge is small and the drain crosses the canal with its bed level equal to or slightly higher than the canal FSL?
(a) Syphon Aqueduct
(b) Level crossing
(c) Inlets and outlets
(d) Aqueduct
This question was posed to me in quiz.
This interesting question is from Types of Cross Drainage Work in portion Cross Drainage Work of Irrigation Engineering