To reduce the cost of the CD works we resort to _____
(a) fluming
(b) blocking of drain
(c) cut-off
(d) lifting of canal water
The question was posed to me in an interview.
This intriguing question comes from Cross Drainage Work Design in chapter Cross Drainage Work of Irrigation Engineering