During a certain week a power plant turns out 84,00,000 kWh and the peak load during the week is 100,000 kW. What is the load factor during the week?

(a) 40%

(b) 45%

(c) 50%

(d) 60%

This question was posed to me in an internship interview.

My query is from Hydropower topic in portion Hydro Electric Power of Irrigation Engineering

1 Answer

0 votes
by (106k points)
Correct choice is (c) 50%

Best explanation: Load factor can be defined as the ratio of average load to the peak load over a given period.

Average load = 84,000,000 / (24 x 7) = 50,000 kW

L.F = Average load / Peak load = 50,000 / 100,000 = 0.5 or 50%.

Related questions

We welcome you to Carrieradda QnA with open heart. Our small community of enthusiastic learners are very helpful and supportive. Here on this platform you can ask questions and receive answers from other members of the community. We also monitor posted questions and answers periodically to maintain the quality and integrity of the platform. Hope you will join our beautiful community
...