As per estimate made by the Central Electricity Authority, the potential of the country is accessed at 84 GW at load factor value of _________________
(a) 40%
(b) 60%
(c) 80%
(d) 20%
I had been asked this question in my homework.
The doubt is from Hydro Electric topic in section Hydro Electric Power of Irrigation Engineering