The correct option is (a) runoff river plant
To explain I would say: In the Run-off river installation, power is generated on the basis of day to day flow in the river. To maintain the water level at a pre-determined level, a weir or a barrage across the river is sometimes constructed. The excess water during the peak-off hours is temporarily stored on u/s side of the barrage.