The correct sequence in the direction of the flow of water for installations in a hydropower plant is _______________________
(a) Reservoir, Surge tank, Turbine, Penstock
(b) Reservoir, Penstock, Surge tank, Turbine
(c) Reservoir, Penstock, Turbine, Surge tank
(d) Reservoir, Surge tank, Penstock, Turbine
I have been asked this question in an online interview.
My question comes from Principal Components of a Hydro Electric Scheme in division Hydro Electric Power of Irrigation Engineering