The crest of a siphon spillway is fixed at ________________
(a) full reservoir level
(b) dead storage level
(c) maximum water level
(d) top of the dam
I had been asked this question in an interview for job.
This key question is from Shaft Spillway topic in chapter Spillways, Energy Dissipators and Spillway Gates of Irrigation Engineering