A trash rack is not required at the entrance of a ____________________
(a) siphon spillway
(b) drum gate installation
(c) morning glory spillway
(d) high-head gate installation
The question was posed to me in unit test.
The origin of the question is River Intakes in division Pressure Conduits, Outlet Works through Dams and Rivers of Irrigation Engineering