An air vent is provided at FRL to break the siphoning action at that level in a ___________________
(a) hooded type of siphon spillway
(b) tilted outlet type of siphon spillway
(c) saddle siphon spillway
(d) volute siphon spillway
The question was asked in a dream while sleeping
I need to ask this question from Shaft Spillway in section Spillways, Energy Dissipators and Spillway Gates of Irrigation Engineering