Which of the following line acts as a dividing line between dry (or moist) and submerged line?
(a) Equipotential line
(b) Path line
(c) Seepage line
(d) Streak line
I got this question during an internship interview.
My question is taken from Design Criteria of Earth Dams topic in section Earthen and Rock Fill Dams of Irrigation Engineering