Correct option is (a) Rolled fill method
For explanation I would say: In the rolled-fill method, the embankment is constructed by placing suitable soil materials in thin layers and compacting the layers with rollers. Power-operated rollers are used for dams and ordinary road rollers can be used for low embankments. The best compaction can be obtained at the optimum moisture content (OMC).