The correct answer is (c) Surplus Water Escape
Explanation: Due to reasons for surplus amount of water to be present in the canal, the supplies shall be reduced or stopped from the head works. Therefore in order to avoid this damage immediate action is needed. This can be achieved by the means of an escape generally called surplus water escape.