In bored pile, concreting is done by using ___________
(a) Auger
(b) Casing tube
(c) Under-reamer
(d) Concrete plug
The question was asked in an international level competition.
The above asked question is from Bored Piles topic in division Pile Foundations of Geotechnical Engineering II