In pressure piles, the soil is excavated by _________
(a) Casing tube
(b) Under-reamer
(c) Concrete plug
(d) All of the mentioned
This question was addressed to me during an interview for a job.
The query is from Bored Piles topic in chapter Pile Foundations of Geotechnical Engineering II