When dewatering system consist of number of well-points ___________ can be considered for a simplified solution.
(a) Linear drainage limit
(b) Seepage analysis
(c) Flow of water
(d) All of the mentioned
I had been asked this question in homework.
This key question is from Seepage Analysis topic in portion Drainage and Dewatering of Geotechnical Engineering I