In vacuum method, the top of bore hole is sealed by __________
(a) soil cement
(b) bentonite
(c) clay
(d) soil cement, bentonite and clay
The question was posed to me during an online exam.
I want to ask this question from Drainage and Dewatering in chapter Drainage and Dewatering of Geotechnical Engineering I