Which of the following has a minimum detention period?
(a) Sludge digestion tank
(b) Primary sedimentation
(c) Skimming tank
(d) Oxidation pond
This question was posed to me in exam.
The question is from Grit Chambers, Tanks and Vacuum Floatation topic in section Unit Operations for Wastewater Treatment, Preliminary Treatment of Environmental Engineering