Find the final moisture content for the batch process if the initial moisture content is 75% (dry basis) and the constant moisture content is 40%. (Includes constant and falling rate period)
(a) 45
(b) 50
(c) 60
(d) None of the mentioned
The question was asked during an internship interview.
The query is from Time period Calculation in Batch Drying topic in chapter Drying of Mass Transfer