In CBR test, the rate of penetration of plunger is _______ mm/min.
(a) 0.25
(b) 1.25
(c) 2.35
(d) 3.25
The question was posed to me at a job interview.
My question is from Flexible Pavement topic in portion Design of Flexible & Rigid Pavement of Geotechnical Engineering II