Which of the following is a remedial measure for water-logging?
(a) Controlling seepage from the canals
(b) By lowering the F.S.L of the canals
(c) Quick disposal of rainwater
(d) Installation of lift irrigation systems
The question was asked during a job interview.
My query is from Salinity and Water-logging in division Water Logged Reclamation and Saline Soils for Agricultural Purposes of Irrigation Engineering