Which of the following is role of Timeline Synchronizer?
(a) It is the base scheduling mechanism for all air vehicle model
(b) It is used to orchestrate all a-periodic processing performed by subsystem
(c) It is used to conduct all periodic processing performed by the simulations subsystem
(d) None of the mentioned
I had been asked this question in an interview for internship.
Question is from Flight Simulation-A Case study in Architecture for Integrability in portion Unit Operations of Software Architecture