The minimum depth of septic tank as per design consideration is ___________
(a) 1.8m
(b) 1m
(c) 1.2m
(d) 1.5m
I had been asked this question in exam.
I want to ask this question from Construction of Septic Tank in section Solid Waste Management, Aerobic & Anaerobic Stabilization Units of Environmental Engineering