+1 vote
in Fluidization Engineering by (102k points)
What is the time required for complete coating to take place in the fluidized bed?

(a) 2-3 sec

(b) 5-10 sec

(c) 1 sec

(d) 20 sec

This question was posed to me during a job interview.

This interesting question is from Coating on Plastic Materials on Metal Surfaces topic in section Particles and Fluidization of Fluidization Engineering

1 Answer

+1 vote
by (103k points)
selected by
 
Best answer
Right answer is (a) 2-3 sec

For explanation: It is optimum time, if more than that coating will be irregular and less than that incomplete coating will take place.

Related questions

We welcome you to Carrieradda QnA with open heart. Our small community of enthusiastic learners are very helpful and supportive. Here on this platform you can ask questions and receive answers from other members of the community. We also monitor posted questions and answers periodically to maintain the quality and integrity of the platform. Hope you will join our beautiful community
...