Which of the options are true for an Active review?
(a) Active design reviews were developed to remedy problems with traditional reviews
(b) The review preparation phase begins with the activity Identify Review Goals, during which the designers choose a specific aspect of the software architecture that they would like to have reviewed
(c) Active review is an examination by experts who answer questions about specific aspects of the design
(d) All of the mentioned
This question was posed to me in an interview.
My question is based upon Finalizing Software Architecture in chapter Unified Modelling Language of Software Architecture