Which of the following statements is False?
(a) Inspections are driven by checklist that inspector uses to guide their review
(b) Designer should modify requirements inspection continuously
(c) Inspection meeting is aimed at detecting defects
(d) None of the mentioned
This question was posed to me by my school principal while I was bunking the class.
My doubt stems from Finalizing Product Design topic in portion Requirements Specification and Planning of Software Architecture